目前2013年職稱英語考試已經(jīng)進(jìn)入倒計時階段,醫(yī)學(xué)教育網(wǎng)職稱英語頻道為大家提供了一些職稱英語考試相關(guān)輔導(dǎo)內(nèi)容,希望對大家有所幫助,祝您在職業(yè)培訓(xùn)教育網(wǎng)學(xué)習(xí)愉快!
The World's Longest Bridge Rumor has it that a legendary six-headed monster lurks in the deep waters of the Tyrrhenian Sea between Italy and the island of Sicily. (46)When completed in 2010, the world's longest bridge will weigh nearly 300,000 tons — equivalent to the iceberg that sank the Titanic — and stretch 5 kilometers long. “That's nearly 50 percent longer than any other bridge ever built,”says structural engineer Shane Rixon.
(47) They're suspension bridges, massive structures built to span vast water channels or gorges. A suspension bridge needs just two towers to shoulder the structure's mammoth weight, thanks to hefty supporting cables slung between the towers and anchored firmly in deep pools of cement at each end of the bridge. The Messina Strait Bridge will have two 54,100-ton towers, which will support most of the bridge's load. The beefy cables of the bridge, each 1.2 meter in diameter, will hold up the longest and widest bridge deck ever built.
When construction begins on the Messina Strait Bridge in 2005, the first job will be to erect two 370 meter-tall steel towers. (48) Getting these cables up will be something. It's not just their length — totally 5.3 kilometers — but their weight. (49)
After lowering vertical“suspender”cables from the main cables, builders will erect a 60 meter-wide 54.630-ton steel roadway, or deck — wide enough to accommodate 12 lanes of traffic. The deck's weight will pull down on the cables with a force of 70,500 tons. In return, the cables yank up against their firmly rooted anchors with a force of 139,000 tons — equivalent to the weight of about 100,000 cars. Those anchors are essential. (50)
A Some environmentalists are against the project on biological grounds.
B What do the world's longest bridges have in common?
C If true, one day you might spy the beast while zipping (呼嘯而過) across the Messina Strait Bridge.
D They're what will keep the bridge from going anywhere.
E The second job will be to pull two sets of steel cables across the strait, each set being a bundle of 44,352 individual steel wires.
F They will tip up the scales at 166,500 tons — more than half the bridge's total mass.
參考答案:46. C. 47. B. 48. E. 49. F. 50. D
1、凡本網(wǎng)注明“來源:醫(yī)學(xué)教育網(wǎng)”的所有作品,版權(quán)均屬醫(yī)學(xué)教育網(wǎng)所有,未經(jīng)本網(wǎng)授權(quán)不得轉(zhuǎn)載、鏈接、轉(zhuǎn)貼或以其他方式使用;已經(jīng)本網(wǎng)授權(quán)的,應(yīng)在授權(quán)范圍內(nèi)使用,且必須注明“來源:醫(yī)學(xué)教育網(wǎng)”。違反上述聲明者,本網(wǎng)將追究其法律責(zé)任。
2、本網(wǎng)部分資料為網(wǎng)上搜集轉(zhuǎn)載,均盡力標(biāo)明作者和出處。對于本網(wǎng)刊載作品涉及版權(quán)等問題的,請作者與本網(wǎng)站聯(lián)系,本網(wǎng)站核實確認(rèn)后會盡快予以處理。
本網(wǎng)轉(zhuǎn)載之作品,并不意味著認(rèn)同該作品的觀點(diǎn)或真實性。如其他媒體、網(wǎng)站或個人轉(zhuǎn)載使用,請與著作權(quán)人聯(lián)系,并自負(fù)法律責(zé)任。
3、本網(wǎng)站歡迎積極投稿
4、聯(lián)系方式:
編輯信箱:mededit@cdeledu.com
電話:010-82311666
010 82311666
400 650 1888